Functie-information:
- Check in advance, in cooperation with Material Controller, if the material to be used for the erection of planned works is available and report to Area Superintendent/Construction Manager any deficiency and the information on the approximate arriving date of material
- Make sure that the prefabricated pipes are stored in a suitable place according to the pipe class, that the covers are well installed to prevent internal damage and that they are easily identifiable
- Ensure that the subcontractor keeps the material received from the warehouse in a suitable and tidy place and that the same is not mixed and used for other purposes than the one for which it was released unless this is explicitly authorized
- In cooperation with project control and with the Construction Manager/Area Superintendent, define the correct pipe assembly sequences considering the priorities and the available constructability studies
- Work with the HL supervisor and safety colleagues to ensure that lifts are conducted in accordance with the method statement and that all prescribed lift precautions are followed
- Collaborate with the instrument supervisor for the preparation of the lines and the installation/removal of the instruments during the various phases of the construction up to the tests and correctly record the various steps in the punch lists according to the provisions of the project procedures
- Check equipment condition on arrival at site
- Assist the Material Controller, when required, for the unloading of equipment and checking of the parts that arrive disassembled on site
- Check that all machineries are protected and supervise the routine maintenance in accordance with Project procedure and Vendor's instruction, during erection period. Record of maintenance shall be prepared and filed to assure that the equipment is properly protected and maintained
- Check the disassembly of equipment accessories before installation
- Issue work order to Subcontractor to install equipment
- Supervise the assembly of equipment
- Check the paralleling of the flange connection with the pipelines and the efficiency of piping support to avoid damage to the equipment
- Supervise and check the lubrication and auxiliary system of equipment in accordance with Vendor's Instructions
- Keep record of modifications and send to Material Controller information necessary to issue a back charge to equipment Vendor's if necessary
- Prepare and fill the testing and obtain approval of installation from Client
Function-requirements:
· Has proven interpersonal skills
· Strong Computer literacy (Word, Excel, Autocad, Naviswork etc)
· Demonstrates accuracy and thoroughness
· Works with integrity and ethically. Upholds organizational values
· Fluent written and spoken English
- Education and Experience Requirements:
· Have solid background of covered discipline
· Have a minimum of 10 years of experience in management of construction site
· Be in possession of VCA-vol certification
· While performing the duties of this job, the employee is frequently required to walk, sit, and stand
· It is required to be in field for most of the working time (60 to 80%)
Solliciteren